Fawkner Centre Redevelopment

The Fawkner Centre Redevelopment, St Kilda Road, Melbourne

The Fawkner Centre was built in 1973 and offered 20 levels of office space which now is being transformed into 253 two & three bedroom apartments. Aitken Freeman has been contracted by Icon Co (Vic) Pty Ltd to supply the floor levelling material for the refurbishment of the Fawkner Centre into 21 levels of apartments.

Due to the age of the building and nature of the construction practices of the day, over the years the suspended floors have deflected & needed to be re-profiled with a self levelling compound while keeping the weight of the material to a minimum. In June 2016, Aitken Freeman started supply of Levelflow & Levelflow Lite floor levelling underlayment compounds.

The Fawkner redevelopment is the largest project undertaken by Aitken Freeman using the Levelflow & Levelflow Lite self levelling compounds. The total floor area is a massive 22,000m2 with varying depths which equate to an average of 40mm. The Levelflow Lite is being used as the bulk fill underlay with the Levelflow self leveller being used as a topping for the final 10mm. In preparation, the floor is shot blasted and primed with Levelflow Primer.

For the duration of the project Aitken Freeman has provided ongoing support to both Icon Co (Vic) Pty Ltd & the specialist contractor placing the self levelling compounds, in the form of forecasting product requirements, providing logistics to site, on site technical support, trouble shooting and application.

The Fawkner Residences 

“Since we started this project Aitken Freeman have provided product to site when required, been a presence on site ensuring the application process is followed & have been on call to help with any questions we have had”
Ben Field
Site Manager, Icon Co (Vic) Pty Ltd

 

North McKinnon Centre Level Crossing Removal Project

Aitken Freeman has had a critical involvement in the largest program of works undertaken on the Melbourne rail system since the construction of the city loop.

In July 2016, we supported DGL Contracting Pty Ltd and Force Precast Australia at the works site at the North McKinnon Centre Level Crossing Removal Project, as part of a 37 day project schedule for the removal of three level crossings and construction of three new stations at Ormond, McKinnon and Bentleigh.

The extremely tight schedule of works presented huge challenges for all involved, but we were able to meet our customers’ requirements in terms of advice, product supply and timely deliveries to site.

Aitken Freeman’s Tecgrout HS was supplied as an economical, high strength Class C non shrink grout for over 40 cubic metres of critical precast element grouting.

You can read more about this project at: http://levelcrossings.vic.gov.au/crossings/north-mckinnon-centre